If your factory, farm, or commercial unit is growing its electricity load in 2026, the grid just got more expensive at exactly the wrong moment. On 7 November 2026, the National Electric Power Regulatory Authority (NEPRA) raised the **incremental consumption tariff for industrial and agricultural consumers to Rs25.30 per unit** — an increase of Rs2.32 from the earlier Rs22.98. For any business planning expansion, this hike quietly taxes the one thing you want to do: grow.

The fix is increasingly obvious. **Commercial solar** now generates power at a fraction of Rs25.30 per unit, letting you serve your extra load with rooftop generation instead of the costliest grid slab. Let's break down what changed, what it costs you, and how solar sidesteps it.

What exactly did NEPRA change on 7 November 2026?

Back in December 2025, the government launched the **Incremental Consumption Package** for industry and agriculture. The idea was to reward load growth: any electricity a business consumed *above its reference baseline* would be billed at a cheap flat rate of Rs22.98 per unit, far below the normal industrial tariff of roughly Rs34 and the agricultural rate of around Rs38. It was a genuine incentive to run extra shifts and expand output.

In November 2026, following a review requested by the Power Division, NEPRA revised that concession upward:

  • The incremental rate climbed from **Rs22.98 to Rs25.30 per unit** (+Rs2.32).
  • The change is **provisional and interim**, effective from the November 2026 billing month.
  • Two NEPRA members dissented; the chairman used a casting vote to approve it.
  • NEPRA's own internal estimate reportedly puts the true marginal cost at **Rs31.83 per unit**, hinting at more pressure to come.

According to NEPRA, the Rs25.30 figure is the "revised marginal rate under the incremental consumption package" — not the general industrial tariff. But for the business actually growing its consumption, that is precisely the rate that bites.

Every extra unit your expansion draws from the grid now costs Rs25.30 — a near-10% jump that penalises exactly the growth the package was meant to encourage.

Why this hits growing businesses hardest

The incremental package only applies to consumption *above* your baseline. So the penalty is laser-targeted at expansion:

  • Add a new production line, a second shift, or a cold-storage unit, and those extra units land in the Rs25.30 slab.
  • A tube well farmer expanding irrigation hours pays the higher incremental rate on the additional pumping.
  • The faster you grow, the larger the share of your bill sits in the most expensive category.

For a mid-sized factory adding, say, 10,000 incremental units a month, the Rs2.32 jump alone adds **Rs23,200 per month** (~Rs278,000 a year) versus the old rate — and the *full* Rs25.30 on those units is what you should really be comparing against solar.

How commercial solar sidesteps the Rs25.30 slab

Here is the core insight: **self-generated solar electricity costs far less than Rs25.30 per unit.** The levelised cost of energy (LCOE) from a well-designed commercial rooftop system in Pakistan today lands roughly between **Rs8 and Rs12 per unit** over its 25-year life. When your own panels power the new load, those units never touch the incremental grid slab at all.

| Source of your expansion power | Approx. cost per unit (2026) | |---|---| | NEPRA incremental industrial/agri rate | Rs25.30 | | NEPRA's estimated true marginal cost | Rs31.83 | | Net-billing export buyback (new prosumers) | ~Rs8–11 | | **Self-consumed commercial solar (LCOE)** | **~Rs8–12** |

The economics are decisive. Instead of buying growth-load units at Rs25.30, you generate them yourself at roughly a third of the price — and you lock that cost in against future tariff hikes, fuel-cost adjustments, and quarterly surcharges.

What commercial solar costs in Pakistan right now

Prices rose in early 2026 as panel rates climbed from about Rs22 to Rs33 per watt, so get current quotes. As a planning guide:

  • A **10 kW on-grid system** runs roughly **Rs900,000 to Rs1.2 million**, producing ~1,350 units per month.
  • Larger commercial arrays scale down on a per-kW basis, often around **Rs85,000–100,000 per kW** installed.
  • Hybrid systems (with battery backup) cost more — typically Rs15–18 lakh for 10 kW — but add resilience against load-shedding.

Against a growth-load bill priced at Rs25.30 per unit, a commercial system often pays back within **3 to 4 years**, then delivers two decades of near-free generation. Our team can model your exact payback — see our guide to sizing a commercial solar system for your business.

Don't forget the net-billing shift

A crucial 2026 change: NEPRA replaced net metering with a **net-billing** regime for new prosumers in February 2026. Under net billing, the grid pays you a separate buyback rate (reported between roughly Rs8 and Rs11 per unit for new users) for exported surplus, rather than crediting you unit-for-unit. There is also a registration fee of around Rs1,000 per kW.

The practical takeaway: **self-consumption is king.** Because exports now earn less than you pay to import, the biggest savings come from using your solar generation on-site — which is exactly what covers your expansion load. Size the system to match daytime consumption rather than to dump surplus to the grid. Read more in our net metering vs net billing explainer.

A practical action plan for 2026

1. **Audit your baseline vs. growth load.** Identify how many units sit above your reference level and are therefore billed at Rs25.30. 2. **Size solar to your daytime expansion load.** Most industrial and agri processes run during sunlight hours — ideal for solar self-consumption. 3. **Prioritise self-use over export** given the reduced net-billing buyback. 4. **Get a bankable quote.** Confirm current panel and inverter prices, warranties, and payback before signing. 5. **Move before the next revision.** With NEPRA's own marginal cost at Rs31.83, the Rs25.30 rate may be a floor, not a ceiling.

Frequently Asked Questions

**What is the incremental consumption tariff of Rs25.30 per unit?** It is the rate NEPRA set on 7 November 2026 for industrial and agricultural electricity consumed *above* a business's baseline reference level. It replaced the earlier Rs22.98 rate and is meant to price the extra, or "incremental," load growing businesses draw from the grid.

**Does the Rs25.30 rate apply to my whole bill?** No. It applies only to additional consumption above your reference baseline under the incremental package — not to your entire usage. That is why expanding operations are hit hardest, since growth lands in this slab.

**How much cheaper is commercial solar than the Rs25.30 tariff?** A commercial rooftop system in Pakistan generates power at roughly Rs8–12 per unit over its lifetime — less than half the incremental grid rate. Self-consuming that solar power means your growth load avoids the Rs25.30 slab entirely.

**With net billing replacing net metering, is solar still worth it?** Yes, especially for businesses. Net billing reduces what you earn for *exported* surplus, but it does nothing to reduce the value of *self-consumed* solar. Since you are offsetting Rs25.30 units with ~Rs10 generation, on-site use delivers strong savings and a 3–4 year payback.

**Will the incremental tariff rise again?** Quite possibly. NEPRA described Rs25.30 as provisional and interim, and its internal marginal-cost estimate is Rs31.83 per unit. Locking in solar now hedges your business against further increases.

The bottom line

NEPRA's Rs25.30 incremental tariff turns business growth into a tax liability. Commercial solar flips that logic: it powers your expansion at roughly a third of the grid's incremental rate, shields you from future hikes, and pays for itself in a few years. For Pakistani industry and agriculture planning to grow in 2026, the question is no longer *whether* to go solar — it's *how fast.*