• By Best Solar Company PK
  • 24 Sep, 2026
  • Solar Policy
  • 8 min read

Electricity bills in Pakistan have crossed a breaking point for millions of low-income families. Against that backdrop, the **KP CM free solar scheme** has become one of the most talked-about relief programmes of 2026. Launched by the Khyber Pakhtunkhwa government under Chief Minister Ali Amin Gandapur, this Rs20 billion initiative aims to solarise **130,000 households** across the province — half of them completely free of cost.

If you live in KP and struggle with load-shedding and rising tariffs, this guide explains exactly who qualifies, what the panel-battery-inverter kit covers, and how to register before the next balloting round.

What Is the KP CM Free Solar Scheme?

Officially titled the **Solarisation of Households** project, the KP CM free solar scheme is being delivered by the Pakhtunkhwa Energy Development Organisation (PEDO) — the provincial body that also runs KP's hydropower projects. The programme is split into two phases of **65,000 households each**, totalling 130,000 homes, and includes 30,000 households in the newly merged tribal districts.

The scheme runs on two tracks:

  • **Free track:** 65,000 of the poorest, most deserving households receive a complete solar system at zero cost.
  • **50% subsidised track:** Another 65,000 households can buy a system at roughly half price, with the government covering the balance.

The **first phase** selected **32,500 households** for free systems through a transparent electronic balloting (e-balloting) draw. Officials confirmed that more than **1.6 million online applications** were received — a signal of just how desperate demand for affordable power has become in the province.

The KP CM free solar scheme is the first provincial programme in Pakistan to combine e-balloting with BISP/Ehsaas targeting, making it far harder to game than manual lists.

Who Is Eligible for the Free Solar Kit?

Eligibility for the free track is deliberately tight, so relief reaches genuinely vulnerable families first. To qualify in 2026 you should generally meet these conditions:

  • **Low monthly consumption:** Your household should use **300 units or fewer per month** (the free tier prioritises the lowest slabs, and the subsidised tier extends to consumers up to around 200 units under partnership terms).
  • **BISP / Ehsaas linkage:** Families already registered with the Benazir Income Support Programme or Ehsaas get top priority.
  • **Vulnerable categories:** Widows, orphans, persons with disabilities, and the transgender community are given preference.
  • **Off-grid areas:** Households in areas with no grid electricity are prioritised.
  • **Bill ownership:** The electricity connection should be in the applicant's name, or that of a father or husband. Renters may apply with an owner's permission letter.

Only one system is granted per household, and applicants must be residents of Khyber Pakhtunkhwa, including the merged districts.

What Does the Panel, Battery & Inverter Kit Cover?

The headline attraction is a ready-to-use **solar home system** rather than a bare panel. While exact specifications vary by vendor lot, the standard free kit is built around a small off-grid setup — commonly described as a **2kW-class system** — designed to run essential loads during outages.

A typical KP CM free solar scheme kit includes:

| Component | What You Get | Purpose | |---|---|---| | Solar panels | Multiple mono-crystalline panels (~2kW) | Daytime generation | | Battery | Deep-cycle storage battery | Power after sunset / outages | | Inverter | Hybrid/off-grid inverter | Converts DC to usable AC | | DC fans | Energy-efficient ceiling fans | Cooling on solar power | | LED lights | Multiple LED bulbs | Lighting without the grid | | Wiring & installation | Cabling, mounting, labour | Free professional fitting |

Installation is free, and there are **no monthly instalments** on the free track. For most beneficiaries, that means fans and lights keep running through hours of load-shedding — a genuine change in daily life, especially in KP's hotter southern districts.

If you want to understand how such systems pay for themselves over time, our guide on solar system sizing for Pakistani homes and this overview of net metering under NEPRA rules are useful companions.

How to Register for the KP Solar Scheme in 2026

Registration is handled online through the official PEDO free-solar portal. Follow these steps carefully:

1. **Open the portal:** Visit the official PEDO free-solar registration page (freesolar.pedokp.gov.pk). Always verify the link through the KP government portal to avoid scam sites. 2. **Enter your details:** Provide your valid CNIC number and an active mobile number registered in your name. 3. **Upload documents:** Attach a clear CNIC (front and back), your latest electricity bill, and proof of residence. 4. **Submit and save your reference:** After submission you'll receive a reference number — keep it safe. 5. **Wait for e-balloting:** Selection happens through a computerised draw. If chosen, you'll get an **SMS on your registered number**. 6. **Installation:** Selected households typically receive installation within roughly 4–8 weeks of confirmation.

If you cannot register online, you may visit your nearest **Deputy Commissioner (DC) office** for assistance. Never pay any "agent," dealer, or middleman — registration and the free kit cost nothing.

Is the KP Free Solar Scheme Worth It?

For a household on 300 units or less, a free 2kW system can offset a large share of a monthly bill that might otherwise run Rs6,000–Rs12,000 in 2026. Even the 50% subsidised track dramatically shortens payback compared with buying a system outright, where a quality 2kW off-grid setup can cost **Rs350,000–Rs550,000** at current PKR prices.

Our practical tip from working with KP customers: apply **only through the official portal**, keep your CNIC and bill details identical to your BISP record, and re-apply in the next round if you miss the first ballot — the second phase still has 65,000 slots.

Frequently Asked Questions

**Is the KP CM solar scheme really free?** Yes. For the first 65,000 selected households — including the 32,500 chosen in phase one — the panel, battery, inverter, fans, lights, and installation are provided at zero cost. A separate 65,000 households can buy systems at a 50% subsidy.

**What is the unit limit to qualify for the free solar scheme?** Priority goes to households consuming around **300 units per month or less**, with BISP/Ehsaas families, widows, persons with disabilities, and off-grid residents at the front of the queue.

**How were the 32,500 households selected?** Through transparent **electronic balloting (e-balloting)** conducted by PEDO after more than 1.6 million online applications, with vulnerable categories prioritised.

**How will I know if I've been selected?** Selected applicants receive an official **SMS on the mobile number** used during registration. Always confirm through the PEDO portal and never trust unofficial calls asking for money.

Conclusion

The KP CM free solar scheme is a rare, high-impact relief measure — real hardware, free installation, and a transparent draw for 130,000 households. If you're eligible, register through the official PEDO portal, keep your documents ready, and watch for balloting announcements. Need help sizing or maintaining a system after installation? Talk to our solar experts at Best Solar Company PK for honest, no-pressure guidance.

Sources: Profit by Pakistan Today, The Express Tribune, Daily Times, Radio Pakistan

Best Solar Company PK designs and installs reliable solar systems in Rawalpindi, Islamabad, Lahore, Multan, Taunsa Sharif and Karachi. Contact us for a free survey and the best advice for your home or business.