- By Best Solar Company PK
- 30 Sep, 2026
- Solar Policy
- 9 min read
The **free solar scheme** rolling out across Pakistan in 2026 is the biggest public push toward rooftop solar the country has ever attempted. Two programmes dominate the headlines right now: Khyber Pakhtunkhwa's plan to hand free solar systems to 130,000 low-income households, and the Prime Minister's Gilgit-Baltistan scheme — which has just set a hard **October 4, 2026 deadline** for selected applicants to physically collect their panels. If your name is on that list, the clock is running.
This guide breaks down who qualifies, how the distribution actually works province by province, and — critically — what your options are if you missed the cut.
KP's Free Solar Scheme: 130,000 Households
The Khyber Pakhtunkhwa government's initiative targets **130,000 households** already registered under the Benazir Income Support Programme (BISP) and the older Ehsaas Programme. Chief Minister Ali Amin Gandapur has framed it as a direct answer to KP's chronic load-shedding, especially in electricity-deprived districts.
Here is how the split works:
- **65,000 households** receive a full solar system completely free of cost.
- **65,000 households** get the same system at a **subsidised 50% price**.
- The **first phase** selects **32,500 beneficiaries** through a transparent **lottery (ballot) system**, prioritising the most power-starved and affected areas.
Each free kit typically includes a **solar panel, a charge controller, a battery, LED bulbs, and a fan** — a small off-grid system designed to keep essentials running through outages, not to power an entire large home.
The goal isn't a luxury upgrade. It's basic energy security — light, a fan, and a phone charge — for families who currently go dark for hours every day.
Priority within the scheme also extends to orphans, widows, persons with disabilities, and transgender persons, reflecting a deliberate social-protection design rather than a first-come, first-served rush.
Gilgit-Baltistan's PM Scheme and the October 4 Deadline
Gilgit-Baltistan's programme is separate and larger in headcount. Launched by Prime Minister Shehbaz Sharif in February 2026, it will give **147,873 verified beneficiaries** solar panels free of cost. A **digital lottery** was used to keep selection transparent, and applications were processed through the official portal at **solar.pmrugb.gov.pk** and district administration offices.
One important detail Pakistani homeowners must understand: under the GB scheme, **the government provides the panels only.** Beneficiaries are responsible for **arranging their own batteries, inverters, and transportation.** Budget for this — a decent battery-and-inverter pairing for a small home can run **PKR 80,000 to PKR 200,000+** depending on capacity and brand, so a "free" panel is not a zero-cost system.
The urgent news, announced on 29 September 2026: the Provincial Steering Committee has issued a **final public notice giving selected applicants until October 4, 2026** to collect their allotted panels. The Information Department was directed to publicise the notice across print, electronic, social, and local media. If you were selected and have not collected, treat this as your last window — panels left uncollected are expected to be reallocated.
The wider GB plan targets roughly **58.8 MW of solar capacity** (about 40 MW for domestic users and 18 MW for small businesses and IT organisations), with a separate **100 MW utility project** whose full cost the federal government has committed to bear.
How Distribution Works, Province by Province
Distribution is **not** run identically nationwide. Each province operates its own model, and understanding the delivery chain tells you where to check your status.
| Region | Who runs it | Selection | What you get | |---|---|---|---| | **KP** | KP Energy Dept. via BISP data | Lottery, phased | Free or 50%-subsidised full kit (panel, battery, controller, fan, bulbs) | | **Gilgit-Baltistan** | PM's scheme / Provincial Steering Committee | Digital lottery | Panels only; you arrange battery, inverter, transport | | **Punjab** | Roshan Gharana (CM Punjab) | Ballot, district by district | 550W–1,100W kits for 0–200 unit users |
Two national bodies sit behind these programmes. The **Alternative Energy Development Board (AEDB)** sets standards, vets vendors, and coordinates federal solar policy, while your local **DISCO** (distribution company — PESCO, MEPCO, LESCO, HAZECO and others) holds the consumption and connection data used to confirm eligibility. When a scheme checks whether your sanctioned load is under 2kW or your monthly usage sits in the 0–200 unit band, that data comes straight from your DISCO billing record. Keep your electricity bills and CNIC details consistent — mismatches are a common reason applications get rejected.
For a fuller picture of how these government programmes fit together, see our overview of the PM national solar rollout and the Punjab Roshan Gharana scheme.
What to Do If You're Not Eligible
Most working- and middle-class households won't qualify — these schemes are means-tested for BISP/Ehsaas registrants and very low usage bands. That doesn't leave you without options.
- **Go for a self-financed rooftop system.** With panel prices in Pakistan down sharply, a quality **5kW system now costs roughly PKR 800,000–1,100,000** installed, and payback periods have shortened to around 3–5 years for grid-tied homes.
- **Understand the new net-billing rules first.** Under the **NEPRA (Prosumer) Regulations, 2026**, net metering ended for new applicants on **9 February 2026.** Exported units are now bought back at a much lower rate — around **PKR 8–11 per unit** for new connections, versus roughly **PKR 25 per unit** grandfathered for anyone with a signed agreement before that date. Read our full breakdown of the NEPRA net-billing rules 2026 before you size your system.
- **Size for self-consumption, not export.** Because buyback rates are now low, the smart 2026 strategy is to consume what you generate during the day. Right-size your array and consider a battery to shift solar into the evening.
- **Watch for the subsidised slots.** In KP, 65,000 households get systems at 50% off — a middle tier worth applying for even if you miss the fully free list.
An honest tip from the field: don't wait for a scheme that may never reach your district. If your bill regularly exceeds PKR 25,000–30,000 a month, a self-funded system almost always beats hoping for a lottery win.
Frequently Asked Questions
**Who qualifies for the KP free solar scheme in 2026?** Households already registered with BISP or the Ehsaas Programme in Khyber Pakhtunkhwa, with priority for orphans, widows, persons with disabilities, transgender persons, and residents of the most load-shedding-affected areas. Selection is by lottery.
**What is the Gilgit-Baltistan free solar scheme deadline?** The Provincial Steering Committee set **October 4, 2026** as the final date for selected applicants to collect their allotted panels. Uncollected panels are expected to be reallocated after this date.
**Is the solar system completely free?** In KP, half the beneficiaries get a full free kit and half pay 50%. In Gilgit-Baltistan, only the panels are free — you must arrange the battery, inverter, and transport yourself, which can cost PKR 80,000 or more.
**What if I don't qualify for any free scheme?** Consider a self-financed system. A 5kW installation costs roughly PKR 800,000–1,100,000, but note that under the 2026 net-billing rules, exported units now earn only about PKR 8–11 each — so size your system for daytime self-consumption.
The Bottom Line
The 2026 **free solar scheme** momentum — 130,000 households in KP and 147,873 in Gilgit-Baltistan — is real, but tightly targeted. If you're selected in GB, collect before **October 4, 2026**. If you're not eligible anywhere, the falling cost of solar plus a self-consumption strategy makes going solar on your own terms more sensible than ever. **Talk to our team at Best Solar Company PK** for a right-sized quote that accounts for the new net-billing rates.
Sources: The Express Tribune — KP scheme, Daily Times, Daily Independent — GB Oct 4 deadline, Business Recorder — 100MW GB project, Profit by Pakistan Today — NEPRA net billing, The Express Tribune — GB digital lottery
Best Solar Company PK designs and installs reliable solar systems in Rawalpindi, Islamabad, Lahore, Multan, Taunsa Sharif and Karachi. Contact us for a free survey and the best advice for your home or business.






